POWER charging terminal - 54 MW

Inputs: Empty accumulators 6/m.
Outputs: Full accumulators 6/m.
Notes: Charging uses 54 MW of surplus power, plus up to 6 MW for ILS charging. Seed the accumulator loop and provide startup power. Full accumulators supply both local and remote consumers. Load drones/vessels and warpers as needed for logistics.
The Preview feature is unavailable at the time.

Blueprint

  • Author: alex2ez
  • Collection: DSP Guide Check
  • Game version: 0.10.35.29088
  • Copied: 0 times
  • Created: about 11 hours ago
0

This blueprint requires

Could not decode blueprint data.

Tagged with