POWER charging terminal - 54 MW

Inputs: Empty accumulators 6/m.
Outputs: Full accumulators 6/m.
Notes: Charging uses 54 MW of surplus power, plus up to 6 MW for ILS charging. Seed the accumulator loop and provide startup power. Full accumulators supply both local and remote consumers. Load drones/vessels and warpers as needed for logistics.
预览功能暂时不可用。

蓝图

  • 作者: alex2ez
  • 收藏集: DSP Guide Check
  • 游戏版本: 0.10.35.29088
  • 复制次数: 0.0 次
  • 创建时间: 大约 12 小时 前
0

此蓝图需要

无法解码蓝图数据。

标签