"No Hazmat Permit": Gigacharger 6 Module, 1170MW Lens Required

  Self-contained Gigacharger module served by PLS.  1170MW charge capacity.  See the reddit post for details. 
The Preview feature is unavailable at the time.

Blueprint

4

This blueprint requires

1017 structures
  • 30
  • 26
  • 40
  • 1
  • 4
  • 916

Tagged with