"No Hazmat Permit": 360MW To Go

A single PLS with 8 discharge exchangers, meant to pull batteries from a dedicated ILS.  Plunk it down anywhere there's a need for a little extra power.

Part of the "E-ILS" post on Reddit.
The Preview feature is unavailable at the time.

Blueprint

3

This blueprint requires

218 structures
  • 6
  • 1
  • 8
  • 1
  • 202

Tagged with