Nilaus Jumpstart #4 of 7 - Stone Bricks

This is the Stone Brick smelting section of the Jumpstart base by Nilaus.

It will need one full yellow belt of Stone (six per second, or two miners covering 6 veins each).

This Blueprint is under 150 facilities, which requires the technology research Mass Construction Lv2.

See the full set of Blueprints in the Nilaus Jumpstart Collection:
https://www.dysonsphereblueprints.com/collections/nilaus-jumpstart

*Credit - This Jumpstart base was originally designed by Nilaus on the following tutorial video:
YouTube: PERFECT START TO A NEW GAME | #1 | Dyson Sphere Program | Lets Play/Walkthrough/Guide

***NOTE - Nilaus released an updated version of this design on 8/3/2021:
YouTube: Jump Start HUB with Simple BLUEPRINTS | Dyson Sphere Program Master Class
New Blueprints Collection on this site: Jump Start HUB with Simple BLUEPRINTS
Official Nilaus Confluence Blueprints page: Dyson Sphere Program - Blueprints
The Preview feature is unavailable at the time.

Blueprint

8

This blueprint requires

85 structures
  • 6
    • 6
  • 1
  • 1
  • 18
  • 59

Tagged with