Turbines 30/min - raw ores

Inputs: Iron ore 300/m; Copper ore 60/m.
Outputs: Turbines 30/m.
The Preview feature is unavailable at the time.

Blueprint

  • Author: alex2ez
  • Collection: DSP Guide Check
  • Game version: 0.10.35.29088
  • Copied: 0 times
  • Created: about 11 hours ago
0

This blueprint requires

Could not decode blueprint data.

Tagged with