EM-Rail Ejector ILS

20 Assembler Mk.III. In: Steel 6000/min, Gear 6000/min, Processor 1500/min, Super-magnetic Ring 3000/min. Out: EM-Rail Ejector 375/min sprayed. Feed Space Warper and Proliferator Mk.III by belt. 15x55.
The Preview feature is unavailable at the time.

Blueprint

0

Power consumption

Power generation

This blueprint requires

522 structures
  • 20
    • 20
  • 7
  • 1
  • 2
  • 100
  • 392

Tagged with