Buiildable with Red Science Techs for vertical contrustion (except Satellite-Substation for highest level power for top Box) Mass Construction 900-Tile All PLS are set to supply and max Drone load. Connections are made to be fitting easily.
(You can reach out to me for any issues: https://www.reddit.com/user/horstdaspferdchen/)